AIRWORTHINESS DIRECTIVE
CAA-AD-042/2002
Date of issue: April 11, 2002
HELICOPTER – MAIN ROTOR
BLADES – INSPECTION
Applicability: Helicopter Mi-2.
Effective date: May
16, 2002
Compliance : Required as indicated in GICA AD SP-0074-2001-A.
Remarks:. The
compliance of this AD must be recorded in Aircraft Logbook, where applicable the
requirements of this AD must be integrated into Aircraft Technical
Documentation. Address inquiries concerning this AD to: Civil Aviation
Authority, Airworthiness Division, Ruzyne Airport, 160 08 Prague 6, Czech
Republic, tel: 420 2 33320922, fax: 420 2 20562270
Ing. Pavel MATOUŠEK
Director of Airworthiness Division
CAA CZ
Warszawa, dn.3/08/2001
DYREKTYWA
ZDATNOSCI - AIRWORTHINESS DIRECTIVE
Nr SP-0074-2001-A
l. Product: Helicopter Mi-2
2. Type Certificate/Approval Number: GILC
/ GICA, BC-073
3. Subject: IMMEDIATE Inspection of the
Main Rotor Blades 50.29.000.00.03.
4. Reason for the issuance of this AD:
Detection of main rotor blades damages in the form of section skin-to-spar
adhesive bonding failures.
5 Corrective action:
Because of detection on the Mi-2
Helicopter in operation of the next occurrence of the Main Rotor Blades
damages, in form of disbonding of skin from the main spar, the IMMEDIATE
inspection of the blades in accordance with the Chapter 6.6.3 Paragraphs 5 and 6
of the Technical Maintenance Manual of the Mi-2 Helicopter, to check for
disbonding of the trailing edge sections from the spar, particularly these
reaching the edge of the skin, must be made.
Inspection is to be made on blades as
listed in the Mandatory Bulletin BO-50-01-47 of the PZL Swidnik installed on
helicopters, as well as on blades stored as spares. For the blades installed on
helicopters the Inspection must be made before the next flight. For blades in
storage the Inspection must be made within two weeks after receipt of this AD.
Additionally, upon installation of the blades on helicopter, the Inspection
must be made before the first flight and again, upon completion of the first
flight, to detect damage, that could occur in operation.
In case of detection of the faults, the
Certificate of Airworthiness is no longer valid. The detection of the faults is
to be immediately reported to the Manufacturer, and also to the General
Inspectorate of Civil Aviation, Warsaw, Poland, fax (+48 22) 630 1518.
6. Name of Aviation Authority that issued
AD: ----------
7. Ref publications: Mandatory Bulletin No. BO-50-01-47, which
has been supplied with the Airworthiness Directive Nr SP-0073-2001-A.
NOTE: The schedule for performance of the
Inspection, prescribed in the Bulletin, is CHANGED. The Inspection must be made
as prescribed in Paragraph 8.
8. Effectivity date of this AD: 3/08/2001
Compliance time: On the blades, installed
on helicopters, if flights have been performed, the inspection must be made
before the next flight.
On the blades in storage - within two (2)
weeks from receipt of this AD, and also- upon installation of helicopter,
before the first flight and again upon completion of the first flight. The
total number of the Inspection is three (3).
Note: This Airworthiness Directive
supersedes the Airworthiness Directive Nr SP-0073-2001-A dated 27/07/2001.
Zygmunt MAZAN
Chief Inspector of Civil Aircraft
Inspection Board