AIRWORTHINESS DIRECTIVE
CAA-AD-054/2001
Date of issue:
June 18, 2001
AIRCRAFT - RAM AIR TURBINE - OVERHAUL
Applicability: AIRBUS INDUSTRIE A300, A310 and A300-600
aircraft, all certified models and all serial numbers, which are fitted with a
DOWTY or HAMILTON SUNDSTRAND ram air turbine.
Effective date: August 09, 2001
Compliance: Required as indicated in DGAC AD 2001-212(B).
Remarks: The compliance of
this AD must be recorded in Aircraft Logbook, where applicable the requirements
of this AD must be integrated into Aircraft Technical Documentation. Address
inquiries concerning this AD to: Civil Aviation Authority, Airworthiness
Division, Ruzyne Airport, 160 08 Prague 6, Czech Republic, tel: 420 2 33320922,
fax: 420 2 20562270.
Ing. Pavel MATOUŠEK
Director of
Airworthiness Division
CAA CZ
DGAC AD No.:
2001-212(B)
AIRBUS INDUSTRIE
A300, A310 and
A300-600 aircraft
Auxiliary
hydraulic power - Overhaul and modification to the ram air turbine (ATA 29)
APPLICABILITY:
AIRBUS INDUSTRIE
A300, A310 and A300-600 aircraft, all certified models and all serial numbers,
which are fitted with a DOWTY or HAMILTON SUNDSTRAND ram air turbine.
REASONS:
The extension of
the "Ram Air Turbine" (RAT) operating life has been justified to
60,000 flight hours. However, and in order to take into account technical
considerations linked to the life limitation of the grease and corrosion
issues, a periodic overhaul of the RAT is rendered mandatory.
In addition,
modifications recommended until now are also rendered mandatory on the occasion
of this overhaul.
ACTIONS:
1) Prior to
accumulation of 20 years since the first installation on aircraft, or within
two years following the effective date of this AD, whichever occurs later,
perform an overhaul of the RAT, in accordance with the instructions of AIRBUS
INDUSTRIE Service Bulletins (SBs) A300-29-0118, A310-29-2087 or A300-29-6049.
This overhaul will
be completed simultaneously and depending on the configuration of each RAT, by
the application of modifications in accordance with the instructions of SBs
A300-29-0118, A310-29-2087 or A300-29-6049.
2) Perform an
overhaul of the RAT every 20 years, in accordance with the instructions of SBs
A300-29-0118, A310-29-2087 or A300-29-6049.
REF: AIRBUS
INDUSTRIE Service Bulletin A300-29-0118
AIRBUS INDUSTRIE Service Bulletin A310-29-2087
AIRBUS INDUSTRIE Service Bulletin A300-29-6049
(Any later approved revision of these SBs is
acceptable).
EFFECTIVE DATE: JUNE 09, 2001