AIRWORTHINESS DIRECTIVE
CAA-AD-047/2001
Date of issue: May 29, 2001
ENGINE - VALVE SPRING RETAINER - REPLACEMENT
Applicability:
Rotax 912 A
Series engines, S/N 4,410.204 up to and incl. 4,410.421
Rotax
912 F Series engines, S/N 4,412.757 up to and incl. 4,412.807, excl. 4,412.795
Rotax
912 S Series engines, S/N 4,922.501 up to and incl. 4,922.636, excl. 4,922.535,
4,922.553 and 4,922.578
Rotax
914 F Series engines, S/N 4,420.039 up to and incl. 4,420.253, excl. 4,420.049,
4,420.068, 4,420.083, 4,420.098, 4,420.115 and 4,420.156.
Effective date: July 12, 2001.
Compliance : Required as indicated in AC AD 108-2001.
Remarks:. The compliance of this AD must
be recorded in Engine Logbook, where applicable the requirements of this AD
must be integrated into Aircraft Technical Documentation. Address inquiries
concerning this AD to: Civil Aviation Authority, Airworthiness Division, Ruzyne
Airport, 160 08 Prague 6, Czech Republic, tel: 420 2 33320922, fax: 420 2
20562270
Ing. Pavel MATOUŠEK
Director of Airworthiness Division
CAA CZ
AIRWORTHINESS
DIRECTIVE
No.
108
Replacement
of Valve Spring Retainers on Single Valve Spring Configuration of Rotax 912
A/F/S Series and Rotax 914 F Series engines
1. Applicability:
Rotax
912 A Series engines, S/N 4,410.204 up to and incl. 4,410.421
Rotax
912 F Series engines, S/N 4,412.757 up to and incl. 4,412.807, excl. 4,412.795
Rotax
912 S Series engines, S/N 4,922.501 up to and incl. 4,922.636, excl. 4,922.535,
4,922.553 and 4,922.578
Rotax
914 F Series engines, S/N 4,420.039 up to and incl. 4,420.253, excl. 4,420.049,
4,420.068, 4,420.083, 4,420.098, 4,420.115 and 4,420.156
and
any all engine that have been converted to a single valve spring configuration
at engine repair/ overhaul according Bombardier Rotax Service Instruction
SI-14-1997
2.
Subject:
Replacement of Valve Spring Retainers on Single Valve Spring Configuration
3.
Reason:
During the operation certain cases of a fracture on Valve Spring Retainers were
detected.
4.
Action:
Replacement of Valve Spring Retainers on Single Valve Spring Configuration have
to be carried out within the compliance time.
The
technical informations of Bombardier Rotax Service Bulletins SB-912-022 and
SB-914-011 are herewith part of this AD
5.
Compliance:
a) On
new engines, which have not yet been operated, the replacement has to be
performed prior to flight operation, but not Later than 01. August 2001
b)
Engines, which have been operated for not more than 10 flight hours, the
replacement has to be performed prior to reaching 10 flight hours, but not
Later than 01. August 2001
c)
Engines, which have been operated for more than 10 but not more than 25 flight
hours, the replacement has to be performed at the 25-hours·inspection but not
later than 01. August 2001
d) Engines, which have had opened the oil
system during repair / maintenance, the replacement has to be Performed within
the next 10 flight hours, but not Later than 01. August 2001
e)
Engines, which have already been operated for more than 25 flight hours (except
those affected by action 5.d) the replacement has to be performed at the next
100 hours inspection, but not Later than 31. December 2001
6.
Accomplishment: The
required action has to be accomplished by the manufacturer or by a
licensed/qualified person. An entry into the aircraft Log has to be done.
7.
Effective Date: 25.
April 2001